{"id":6736,"date":"2026-06-22T07:17:11","date_gmt":"2026-06-22T05:17:11","guid":{"rendered":"https:\/\/schreinereischmutz.ch\/?post_type=avada_faq&#038;p=6736"},"modified":"2026-06-22T07:17:11","modified_gmt":"2026-06-22T05:17:11","slug":"wie-laeuft-ein-umbau-ab-und-wie-lange-dauert-er","status":"publish","type":"avada_faq","link":"https:\/\/schreinereischmutz.ch\/en\/faq-items\/how-does-a-renovation-proceed-and-how-long-does-it-take\/","title":{"rendered":"How does a renovation proceed and how long does it take?"},"content":{"rendered":"<p>During a renovation we plan the process so that your daily life is disturbed as little as possible. First we dismantle the old kitchen, then we prepare walls, floors and connections \u2013 followed by installation and commissioning. To make everything fit together, we coordinate the tradespeople through a construction schedule.<\/p>\n<p>Depending on the scope, a renovation takes at least about two weeks. If structural adjustments are necessary, it can extend over several months. We set the schedule in advance together with you.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>When planning a renovation we schedule the work so that your daily life is disturbed as little as possible. First we dismantle the old kitchen, then we prepare walls, floors and connections \u2013 followed by installation and commissioning. To make everything fit together we coordinate the tradespeople via a construction program. Depending on the scope, a renovation takes at least about two weeks.<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"faq_category":[86],"class_list":["post-6736","avada_faq","type-avada_faq","status-publish","format-standard","hentry","faq_category-lieferzeit-montage-und-umbau"],"_links":{"self":[{"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/avada_faq\/6736","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/avada_faq"}],"about":[{"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/types\/avada_faq"}],"author":[{"embeddable":true,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/comments?post=6736"}],"version-history":[{"count":1,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/avada_faq\/6736\/revisions"}],"predecessor-version":[{"id":6737,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/avada_faq\/6736\/revisions\/6737"}],"wp:attachment":[{"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/media?parent=6736"}],"wp:term":[{"taxonomy":"faq_category","embeddable":true,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/faq_category?post=6736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}