{"id":6775,"date":"2026-06-22T07:23:03","date_gmt":"2026-06-22T05:23:03","guid":{"rendered":"https:\/\/schreinereischmutz.ch\/?post_type=avada_faq&#038;p=6775"},"modified":"2026-06-22T07:23:03","modified_gmt":"2026-06-22T05:23:03","slug":"wie-laeuft-ein-kuechenprojekt-bei-ihnen-ab","status":"publish","type":"avada_faq","link":"https:\/\/schreinereischmutz.ch\/en\/faq-items\/how-does-a-kitchen-project-run-for-you\/","title":{"rendered":"How does a kitchen project run for you?"},"content":{"rendered":"<p>At the beginning we visit you and get an overview of the situation. If plans already exist, we can skip this step.<\/p>\n<p>Then follows our initial meeting: We listen \u2013 what are your wishes, your experiences, what is important to you? Afterwards there is a tour of our showroom. With samples and the existing exhibition kitchens we develop your kitchen together. Allocate 1.5 to 2.5 hours for this.<\/p>\n<p>Afterwards we need 2 to 3 weeks to prepare everything. Then comes the presentation: We show you your kitchen, usually in several variants. A \u201cPremia\u201d that covers all your wishes, an \u201cOptima\u201d that is still upscale, and, depending, a \u201cBasica\u201d, still custom-made but simplified.<\/p>\n<p>Based on the visualization you have the basis to assess whether we should pursue the project together. From here our partnership becomes binding, and we dive into the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>At the beginning we will visit you and get an overview of the situation. If plans already exist, we can skip this step. Then follows our initial conversation: we listen \u2013 what are your wishes, your experiences, what is important to you? Afterwards there is a tour of our showroom. With samples and the existing exhibition kitchens<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"faq_category":[82],"class_list":["post-6775","avada_faq","type-avada_faq","status-publish","format-standard","hentry","faq_category-planung-beratung-und-ablauf"],"_links":{"self":[{"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/avada_faq\/6775","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/avada_faq"}],"about":[{"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/types\/avada_faq"}],"author":[{"embeddable":true,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/comments?post=6775"}],"version-history":[{"count":1,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/avada_faq\/6775\/revisions"}],"predecessor-version":[{"id":6776,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/avada_faq\/6775\/revisions\/6776"}],"wp:attachment":[{"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/media?parent=6775"}],"wp:term":[{"taxonomy":"faq_category","embeddable":true,"href":"https:\/\/schreinereischmutz.ch\/wp-json\/wp\/v2\/faq_category?post=6775"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}