During a renovation we plan the process so that your daily life is disturbed as little as possible. First we dismantle the old kitchen, then we prepare walls, floors and connections – followed by installation and commissioning. To make everything fit together, we coordinate the tradespeople through a construction schedule.
Depending on the scope, a renovation takes at least about two weeks. If structural adjustments are necessary, it can extend over several months. We set the schedule in advance together with you.