Delivery Time, Installation and Renovation

How does a renovation proceed and how long does it take?

When planning a renovation we schedule the work so that your daily life is disturbed as little as possible. First we dismantle the old kitchen, then we prepare walls, floors and connections – followed by installation and commissioning. To make everything fit together we coordinate the tradespeople via a construction program. Depending on the scope, a renovation takes at least about two weeks.

By |2026-06-22T07:17:11+02:00June 22nd, 2026||Comments Off on How does a renovation proceed and how long does it take?

How does the on-site installation work – and can I cook during this time?

The installation follows a construction schedule, with each tradesperson arriving as discussed. For the transition period we provide a provisional solution – from the cooktop to a cart with an integrated oven and cooktop. Your cooking options are limited during this time.

By |2026-06-22T07:16:35+02:00June 22nd, 2026||Comments Off on How does the on-site installation work – and can I cook during this time?